Newmarket House Fire,Dec 2006

March 2007

April 2007

Completed May 2007

Barrie Kitchen fire Before (Oct 2006)

Completed Kitchen (Dec 2006)

Shelburn house fire New roof,windows, doors, siding and complete interior.


Structural fire Main beam,joist, walls and subfloorreplaced


Bedroom Gutted by fire and complete rebuild


Bolton Fire -moved wall, installed window and custom kitchen


Deck fire and brick removal on left to complete replacement on right


Kitchen Fire Packed out and total demo then replaced


Gutted room and moved fireplace to central location allowing for built ins on each side. Rough in for Plasma Tv with Surround sound.


Dining room fire complete tear our and added pot lights, garden doorsand designer ceiling


Barrie Vehicle Impact Before

New Brick and Stone

Shower Stall Plumbing Fire Slate Tile


Before 1960 bathroom complete gut and replace average grade.


Basement Flood Younge and Finch Toronto upgraded with fireplace, drywall and ceramics. Post cover over where bar was.


Basement Flood Upgraded to drywall, trim and ceramic flooring.Note we opened wall by stairs to make open concept.


Church Fire Sutton Ontario


Interior of Church Fire in Sutton Ontario


House addition in Richmond Hill Ontario (see support to upper brick homeowner wanted saved above addition) This is a kitchen extention.


Tear down and buildNEW 6PLEX in the Beaches Toronto Ontario


Completed Front and Rear of 6 plex (Toronto)


Fridgewater lineleaked anddamaged hardwood floors so we removed kitchen complete then installed ceramic (including damaged Kick plate) and reinstalled kitchen!!!


Bathroom Fire complete tear out and replace Toronto Ontario.


Maple Ont. House fire


Thornhill House fire August 2007

Mt Albert Fire May 2007
